CONTERIXEngineering Infrastructure. Enabling Tomorrow. Talk to an Expert

Services / Cloud & Hybrid Infrastructure

Cloud and hybrid,
moved in waves.

Servers and applications to Azure, AWS, a hosted VMware platform or back on premises, planned from real dependency data and moved in waves with a rollback for each one.

A cable closet with hundreds of blue patch cables hanging in loops across the switches

Cloud & Hybrid Infrastructure

What we do

Migrations that start with what you run, not with the target platform.

Technology

Platforms we work with

  • Azure IaaS
  • Azure App Service
  • Azure SQL
  • Azure Storage
  • Azure Migrate
  • Azure Site Recovery
  • AWS EC2
  • S3
  • VPC
  • Cloud Director
  • Veeam
  • Zerto
  • Windows Server
  • Red Hat and CentOS

Linux and Windows servers moved to Azure IaaS and web applications to Azure PaaS for a UK payments company; AWS EC2 and S3 delivered for MSP customers.

How an engagement runs

Five steps, written down

Every engagement follows the same steps, with written plans and a rollback for each change.

  1. 01AssessUnderstand your goals, environment and challenges.
  2. 02ArchitectDesign the right solution for your needs.
  3. 03MigratePlan and execute with minimal disruption.
  4. 04OptimiseImprove performance, resilience and cost efficiency.
  5. 05SupportOngoing expertise to keep you secure and ahead.

Deliverables

What you receive

Most migrations start somewhere like this. Discovery is what turns a cable closet into a wave plan. Every engagement ends with documents and code you own.

  • An inventory with dependencies and performance data
  • A target design document
  • A wave plan with rollback steps
  • Cutover runbooks and test results per wave
  • A cost baseline for the new platform

Experience

Experience behind it

From the founder’s own project history. Clients are described, not named.

FAQ

Questions we hear

Is moving to the cloud cheaper?

Not by default. Steady workloads are often cheaper on owned or hosted VMware; variable or new workloads usually suit Azure or AWS. We cost both before anything moves.

How long does a migration take?

Discovery and planning usually take two to four weeks. Each wave then fits a maintenance window; a 40-server estate is typically four to six waves.

What if a wave goes wrong?

Every wave has a go/no-go point and a tested rollback. The source stays intact until the wave has run cleanly for an agreed period.

A clear first step

Start with the VMware Renewal Decision.

Fixed scope, fixed price, agreed before we start. You keep the report whatever you decide.